干式充填法 dry filling method
- 目前- 350水平以上还在采用干式充填法还在出矿,- 350水平以下采用无底柱分段崩落法,已开采到- 385水平。
It adopt dry filling method in the orebody above -350m level and adopt the method of sublevel caving in the orebody under the level. Exploitation engineering already reach -385m level. - 为此,试验用盘区上向分层干式充填采矿法进行回采,取得了较好的效果。
As viewed form this, the panel upward horizontal cut-and dry filling method has been tried to use for this orebody mining, with a better results.
您正在访问的是
中国词汇量第二的英语词典
更多精彩,登录后发现......