外部链接:    leo英德   dict有道 百度搜索百度 google谷歌 google图片 wiki维基 百度百科百科   

 坝趾滤层 [bà zhǐ lǜ céng添加此单词到默认生词本
toe filter

  1. 简要论述泽雅水库面板堆石坝坝基处理和防渗的原则及设计要点.板基础和堆石体各区砂砾石基础开挖,除板与其下游1/9底宽范围以及脚挖除冲积至弱风化(局部微风化)基岩外,其余部分均予以保留.断破碎带处理,板部位采用混凝土塞,其它部位采用半透水料置换,并根据本工程特点在下游脚加设了反滤层.为提高基的整体性和防渗性能,对板进行了固结和帷幕灌浆.达到了安全、经济、便于施工的目的,运行情况良好,可为面板堆石的设计和研究提供参考与借鉴.
    A brief introduction is given to the treatment of the Zeya dam foundation,principles of seepage control and design of the concrete face rockfill dam of the Zeya reservoir.As for the excavation of the sand-gravel zones,except the toe slab and its 1/9 bottom width down stream,the alluvial layers are excavated to the micro-weathered rocks,while the other sections remain unexcavated.Regarding to the treatment of the fracture zones,concrete filling is used for the toe slabs and semi-permeable materials are used for other section.According to the construction characteristics,a filter is placed in the down stream embankment foot.To improve the integrity of the dam foundation and anti-seepage capability consolidation grouting and curtain grouting are adopted.As a result safety,economic benefit,convenience in construction and good performace are achieved.
  2. 文摘:简要论述泽雅水库面板堆石坝坝基处理和防渗的原则及设计要点.板基础和堆石体各区砂砾石基础开挖,除板与其下游1/9底宽范围以及脚挖除冲积至弱风化(局部微风化)基岩外,其余部分均予以保留.断破碎带处理,板部位采用混凝土塞,其它部位采用半透水料置换,并根据本工程特点在下游脚加设了反滤层.为提高基的整体性和防渗性能,对板进行了固结和帷幕灌浆.达到了安全、经济、便于施工的目的,运行情况良好,可为面板堆石的设计和研究提供参考与借鉴.
    Abstract: A brief introduction is given to the treatment of the Zeya dam foundation,principles of seepage control and design of the concrete face rockfill dam of the Zeya reservoir.As for the excavation of the sand-gravel zones,except the toe slab and its 1/9 bottom width down stream,the alluvial layers are excavated to the micro-weathered rocks,while the other sections remain unexcavated.Regarding to the treatment of the fracture zones,concrete filling is used for the toe slabs and semi-permeable materials are used for other section.According to the construction characteristics,a filter is placed in the down stream embankment foot.To improve the integrity of the dam foundation and anti-seepage capability consolidation grouting and curtain grouting are adopted.As a result safety,economic benefit,convenience in construction and good performace are achieved.



加入收藏 本地收藏 百度搜藏 QQ书签 美味书签 Google书签 Mister Wong
您正在访问的是
中国词汇量第二的英语词典
更多精彩,登录后发现......
验证码看不清,请点击刷新
  注册